
Bramston Park
An Integrated Retirement Village located within the grounds of the Oakley Hall Estate in Hampshire. The 18,100m² development will provide 147 new homes for people aged over 60, together with a 1,350m² central facilities building and extensive communal landscaped areas. The accommodation comprises two and three-bedroom apartments, bungalows and cottages.
- Client
- Rangeford Villages
- Location
- Oakley, Hampshire
- Sector
- Later living
- Status
- Approved
- Our role
- Architect, Lead Designer, CMT
- Developer
- Rangeford Villages
- Operator
- Rangeford Villages
- Local authority
- Basingstoke and Deane Borough Council
- GIA
- 18,100m²
- Site area
- 16.35 acres
- Year
- 2026

Masterplan development
The masterplan has four character areas: Farmstead, Stable Courtyard, Meadow's Edge and Copse Close. Each area responds to its position on the site, creating a clear and legible composition. Wide open spaces separate the areas, strengthening their identity and clarity. Within each area, a mix of building types, different sizes, shapes, details and materials adds further variety.
The diagrams below illustrate the key vistas and principle facades. In these locations, additional architectural interventions have been applied to enhance legibility and character. These details include gables, flint and intricate brick detailing and the framing of important views.



Context analysis
Site analysis identifies the key features and characteristics of the local area. The study of the form, proportions, composition, materials and detailing directly informs the design approach.


Form development
The articulation of the built form in each character area is detailed in a way that creates a difference between the spaces. The three block types below show how the facade is broken down to reduce the feeling of one full mass.




"We are thrilled to have secured reserved matters planning for a new state of the art retirement village in the grounds of Oakley Hall, Hampshire. Working closely with Basingstoke local authority Rangeford, amn architects and the project team were able to develop a vision for the site which was sensitive to its rural location while still delivering the outstanding facilities that make a Rangeford village so special. The design team were able to build on the success of our Strawberry Fields village in South Cambridgeshire, incorporating lessons learnt and owner feedback into the design proposals."
— Will Coote, Senior Land Manager, Rangeford Villages
Meadow's Edge

Central facilities building
The Central Facilities Building is at the heart of the masterplan, designed as a social hub for residents and visitors for leisure, and designed to recognise how staff deliver essential services. Active uses are placed along key elevations to create a lively frontage on arrival and to maximise the external amenity and framed views of the adjoining landscape. Well considered spatial adjacencies ensure the building remains operationally and commercially efficient.


Copse Close
Larger footprint buildings are located at the centre of the masterplan and take on a more agricultural and farmstead influenced character. Smaller scale bungalows and cottages are positioned towards the more sensitive site perimeter in a looser arrangement.

